Critical Infrastructure
Data Centre Construction and Turnkey Delivery
ONGSEC builds a fully designed data centre on a turnkey basis, from shell and core through to commissioning; alternatively it acts as the implementation contractor for selected disciplines only (electrical, mechanical, extra-low v…
Scope of service
What we do under this heading
Architectural and Structural Works
Shell and core arrangement, partition walls and fire-rated compartments (EI 60 / EI 120); Raised floor system: load ca…
VIEWElectrical Infrastructure and Power Works
The majority of data centre availability is determined by the design and implementation quality of the electrical infr…
VIEWMedium and Low Voltage Distribution
Medium-voltage switchgear, dry or oil-type transformer installation and protection coordination; Main distribution pan…
VIEWUninterruptible Power and Generators
UPS selection and installation: online double-conversion, modular/scalable, parallel-redundant architectures; Battery …
VIEWRack Level Distribution
Selection and installation of busbar or cable-type distribution; Rack PDUs: metered, switched and outlet-metered model…
VIEWEarthing, Lightning Protection and Lighting
Earthing network, equipotential busbar system and measurement/reporting; Lightning protection system (air terminals, d…
VIEWFire Detection and Suppression
Aspirating (VESDA-type) very early smoke detection system design and installation; Addressable fire detection panel, o…
VIEWLeak Detection and Environmental Monitoring
Zone and spot water leak detection cable / sensor installation; Temperature and humidity sensors positioned per ASHRAE…
VIEWArchitectural and Structural Works
- Shell and core arrangement, partition walls and fire-rated compartments (EI 60 / EI 120)
- Raised floor system: load capacity calculation, antistatic finish, cable and air plenum arrangement
- Suspended ceiling, air return plenum and sealing applications
- Fire- and water-resistant security room solutions (EN 1047-2 / ECB-S certified modular room alternative)
- Security doors, mantraps and armoured door installations
- Waterproofing, vapour barrier and floor levelling
- Special rooms requiring electromagnetic (RF) shielding
- Fire-stop and sealed transit elements at cable penetrations
Electrical Infrastructure and Power Works
The majority of data centre availability is determined by the design and implementation quality of the electrical infrastructure. ONGSEC engineers, installs and tests the entire chain from the medium-voltage entry point to the socket at rack level.
Medium and Low Voltage Distribution
- Medium-voltage switchgear, dry or oil-type transformer installation and protection coordination
- Main distribution panel (MDP), sub-distribution panels and power factor correction systems
- Automatic transfer switch (ATS) and static transfer switch (STS) applications
- Selectivity and short-circuit calculations, protection device coordination study
- Harmonic analysis, active/passive harmonic filters and power factor correction
Uninterruptible Power and Generators
- UPS selection and installation: online double-conversion, modular/scalable, parallel-redundant architectures
- Battery system design (VRLA / Li-ion), autonomy calculation, battery room ventilation and monitoring
- Diesel generator plant: sizing, synchronisation, parallel operation, load transfer scenarios
- Fuel storage, day tank, transfer system and fuel quality management
- Generator exhaust, silencer, vibration isolation and noise control
- Full-load and step-load testing with load banks
Rack Level Distribution
- Selection and installation of busbar or cable-type distribution
- Rack PDUs: metered, switched and outlet-metered models
- A/B dual-feed architecture and phase balancing
- Monitoring energy consumption at rack and outlet level and feeding it into DCIM
Earthing, Lightning Protection and Lighting
- Earthing network, equipotential busbar system and measurement/reporting
- Lightning protection system (air terminals, down conductors) and surge protection (SPD) stages
- Lighting design, emergency lighting and wayfinding luminaires
- Labelling and documentation of electrical rooms and cable shafts
Fire Detection and Suppression
- Aspirating (VESDA-type) very early smoke detection system design and installation
- Addressable fire detection panel, optical/thermal detectors and cross-zoning logic
- Gaseous suppression: FM-200 (HFC-227ea), NOVEC 1230 and inert gas (IG-55 / IG-541) alternatives
- Discharge quantity and hold time calculation, room integrity (door fan) test
- Pressure relief damper calculation and installation
- Fire scenario programming: shutting down cooling, closing dampers, releasing doors, announcement and alarm integration
- Design and acceptance testing to TS EN 15004 and NFPA 2001
- Periodic maintenance, cylinder weighing checks and certified refill coordination
Leak Detection and Environmental Monitoring
- Zone and spot water leak detection cable / sensor installation
- Temperature and humidity sensors positioned per ASHRAE recommendations (rack bottom/middle/top)
- Differential pressure, airflow and door status sensors
- DCIM / BMS integration, threshold values and alarm hierarchy definition
- Alarm routing integrated with SMS, e-mail and SOC/NOC
Physical Security and Access Control
- Multi-layered access architecture: site → building → white space → rack level authorisation
- Card, PIN and biometric access control, anti-passback and two-person rule
- Mantrap, turnstile and armoured door applications
- CCTV system: corridor, door, rack row and perimeter camera placement, retention period calculation
- Electronic locks at rack level and door opening logging
- Visitor management, escort rules and access record archiving procedures
Rack, Cabinet and Structured Cabling Installation
- Rack and cabinet supply, installation, fixing and seismic bracing
- Hot aisle / cold aisle containment systems, roof and door applications
- Blanking panels and brush grommets to control air leakage
- Copper and fibre backbone cabling, MPO/MTP cassette and trunk solutions
- Patch panels, cable managers and colour-coded labelling standard
- Cable testing and certification, delivery of measurement reports and manufacturer warranty application
Commissioning and Testing
The most frequently skipped stage in data centre projects is integrated testing of systems under real load. ONGSEC applies a staged commissioning methodology and delivers the output of each stage in writing.
- Level 1–2: factory acceptance tests (FAT) and site delivery checks
- Level 3: post-installation static checks, insulation and continuity measurements
- Level 4: component-based functional tests (UPS, generator, cooling, fire, access control)
- Level 5: integrated systems test (IST) — step load with load banks, utility failure and fault scenarios
- Black building test: verifying facility behaviour under total loss of supply
- Thermal imaging scan of connection points and reporting
- Cooling performance test, airflow measurement and temperature mapping
- Punch list management and closure against acceptance criteria
Modular, Container and Edge Data Centres
- Engineering and installation of prefabricated modular data centre solutions
- Container-type mobile data centres for field, temporary facility or disaster scenarios
- Single-rack or micro data centre cabinets with their own cooling, UPS and fire systems
- Replicating remote-site and branch edge data centres from a standard template
- Remote monitoring and lights-out operating architecture
Documentation, Handover and Operations
- As-built drawings (architectural, electrical, mechanical, extra-low voltage) and current single line diagrams
- Operation and maintenance manual (O&M), equipment catalogue and warranty documents
- Standard operating procedures (SOP), maintenance procedures (MOP) and emergency procedures (EOP)
- Recording capacity and asset inventory into the DCIM system
- On-site handover training for the operations team and scenario-based drills
- Definition of periodic maintenance and fault response scope during the warranty period
On this page
- Architectural and Structural Works
- Electrical Infrastructure and Power Works
- Medium and Low Voltage Distribution
- Uninterruptible Power and Generators
- Rack Level Distribution
- Earthing, Lightning Protection and Lighting
- Fire Detection and Suppression
- Leak Detection and Environmental Monitoring
- Physical Security and Access Control
- Rack, Cabinet and Structured Cabling Installation
- Commissioning and Testing
- Modular, Container and Edge Data Centres
- Documentation, Handover and Operations
Typical deliverables
- Implementation drawings
- Test protocols
- IST report
- As-built package
- O&M manuals
- SOP / MOP / EOP
Let us define the scope together
A short discovery call is enough to identify the slice of this portfolio you actually need.
Request a quoteRelated services
What usually runs alongside this
Data Centre Consultancy, Feasibility and Design
We shape data centre investment from feasibility to tender documentation with independent engineering judgement.
EXPLORE Critical InfrastructureHVAC and Mechanical Infrastructure Systems
The complete mechanical infrastructure: heat load calculation, equipment selection, commissioning and efficiency optimisation.
EXPLORE Critical InfrastructureExtra-Low Voltage Systems and Electrical Engineering
From structured cabling to CCTV and access control, from fire detection to building automation and electrical engineering.
EXPLOREGet started
Let us talk about your project.
The first meeting is a discovery session, not a sales pitch. You are also welcome to evaluate our capability directly through a short pilot or proof of concept (PoC) in your own environment.