Critical Infrastructure
Data Centre Consultancy, Feasibility and Design
ONGSEC models data centre investments technically and economically from the very first idea, so that the right decision is made. Our consultancy begins by questioning whether the investment is needed at all, continues through capa…
Scope of service
What we do under this heading
Feasibility and Investment Analysis
The most critical mistake in data centre investments is misjudging capacity requirements. Our feasibility studies mode…
VIEWSite Selection and Evaluation
The right location is a critical decision for the sustainability and operational reliability of the investment. ONGSEC…
VIEWConcept and Detailed Design
Data centre design covers a comprehensive architectural planning process aligned with your current and future IT needs…
VIEWCapacity and Redundancy Architecture
Basis of Design document and written record of design assumptions; Determining the redundancy level: cost–availability…
VIEWPhysical Layout and Cabling
Physical space planning, rack and cabinet layout, aisle widths; Hot aisle / cold aisle arrangement and containment str…
VIEWElectrical and Mechanical Design Inputs
Single line diagram and power distribution architecture; Power density (W/rack) calculation, PDU/ATS/STS design and lo…
VIEWStandards Compliance and Certification Consultancy
Documented conformity to international standards and Tier classification increases corporate reputation, secures busin…
VIEWEnergy Efficiency and Sustainability
PUE (Power Usage Effectiveness) measurement methodology and target setting; WUE (Water Usage Effectiveness) and CUE (C…
VIEWFeasibility and Investment Analysis
The most critical mistake in data centre investments is misjudging capacity requirements. Our feasibility studies model 5–10 year growth scenarios based on the current load profile and compare the investment and operating cost of each scenario.
- Establishing current IT load and growth projection (rack count, kW/rack, total IT load)
- Capital expenditure (CAPEX) and total cost of ownership (TCO) analysis
- Operating cost (OPEX) projection, energy cost modelling and return on investment (ROI) calculation
- Comparative analysis of different capacity scenarios (250 kW, 1 MW, 5 MW, 10 MW+)
- Cost–risk comparison of on-premise, colocation, hybrid and cloud alternatives
- Phased investment (modular growth) modelling and definition of the first phase scope
- Legal, environmental and zoning compliance assessment
- Decision file and option matrix for presentation to executive management
Site Selection and Evaluation
The right location is a critical decision for the sustainability and operational reliability of the investment. ONGSEC specialists produce an independent evaluation report against technical and strategic criteria, scoring and comparing candidate sites.
- Geographic and natural risk analysis (distance to fault lines, flood zones, landslide and fire risk)
- Environmental risk analysis (fuel depots, chemical plants, airport flight corridors, railways, high-voltage lines)
- Power infrastructure review: available transformer capacity, dual feed from separate feeders, distance to the medium-voltage connection point
- Fibre optic access, carrier diversity and the option of diverse carrier entrance rooms
- Zoning status, building permits, height restrictions and district planning review
- Preliminary assessment of soil survey needs, bearing capacity and structural suitability
- Water supply for cooling, waste heat management and renewable energy integration potential
- Logistics access: heavy equipment routes, crane positioning, generator and chiller placement areas
- Weighted scoring matrix comparison of candidate sites and recommendation report
Concept and Detailed Design
Data centre design covers a comprehensive architectural planning process aligned with your current and future IT needs. ONGSEC designs every component in an integrated manner — from space selection to power infrastructure, from cooling systems to cabling — and converts them into implementation drawings.
Capacity and Redundancy Architecture
- Basis of Design document and written record of design assumptions
- Determining the redundancy level: cost–availability analysis of N, N+1, 2N and 2N+1 topologies
- Power density (kW/rack) target and mixed-density (low/medium/high) zoning
- Defining white space and grey space ratios
- Modular block design suited to phased growth and reserve for future expansion
Physical Layout and Cabling
- Physical space planning, rack and cabinet layout, aisle widths
- Hot aisle / cold aisle arrangement and containment strategy reflected in the design
- Structured cabling topology selection (ToR, EoR, MoR) and backbone cabling plan
- Copper and fibre cable routes, cable tray and duct cross-section calculations
- Main distribution area (MDA), horizontal distribution area (HDA) and entrance room (ER) planning
Electrical and Mechanical Design Inputs
- Single line diagram and power distribution architecture
- Power density (W/rack) calculation, PDU/ATS/STS design and load balancing
- UPS capacity and autonomy calculation, generator sizing and fuel autonomy
- Cooling capacity (kW) modelling, airflow optimisation and CFD analysis
- Fire detection and gaseous suppression integrated into the design
- Environmental monitoring and DCIM architecture, sensor placement plan
Standards Compliance and Certification Consultancy
Documented conformity to international standards and Tier classification increases corporate reputation, secures business continuity and reinforces customer confidence. ONGSEC provides technical support from the design phase through to the certification audit.
- Uptime Institute Tier I–IV certification consultancy (Design Documents and Constructed Facility)
- TIA-942 (Telecommunications Infrastructure Standard for Data Centers) preparation and compliance
- EN 50600 series European data centre standards compliance consultancy
- ANSI/BICSI 002 data centre design and implementation best practices
- Compliance with ASHRAE TC 9.9 thermal guidelines and operating envelope verification
- Adapting ISO 27001 Annex A physical and environmental security controls to the data centre
- Technical support through independent auditor processes, gap closure and document management
Energy Efficiency and Sustainability
- PUE (Power Usage Effectiveness) measurement methodology and target setting
- WUE (Water Usage Effectiveness) and CUE (Carbon Usage Effectiveness) tracking
- Modelling free cooling potential against local climate data
- Waste heat recovery and feasibility of integration into building heating
- Renewable energy integration (solar, wind) and energy storage assessment
- Improvement list based on the EU Code of Conduct for Data Centres best practices
- Energy efficiency audit and quick-win report for existing data centres
Relocation, Consolidation and Modernisation Consultancy
Moving an existing data centre to a new facility, or consolidating several data centres under one roof, are critical projects that require meticulous planning. ONGSEC manages these processes with a zero-downtime objective.
- Existing infrastructure inventory and application dependency mapping
- Definition of migration waves, phased migration planning and risk matrix
- Live migration of systems and planning of outage windows
- Physical relocation logistics, equipment packing, insurance and secure transport coordination
- Data integrity verification, acceptance tests and rollback plan
- Safe decommissioning of the old data centre and data destruction processes
Specification, Quantity Take-off and Tender Documentation
- Preparation of technical specifications (vendor-neutral, with measurable acceptance criteria)
- Survey, quantity take-off and unit price analysis; approximate cost study
- Preparation of technical annexes to administrative specifications and support in answering tender questions
- Establishing bid evaluation criteria and a technical scoring matrix
- Technical evaluation of received bids and conformity report
- Owner's engineer supervision of contractor works and technical progress-payment control
On this page
- Feasibility and Investment Analysis
- Site Selection and Evaluation
- Concept and Detailed Design
- Capacity and Redundancy Architecture
- Physical Layout and Cabling
- Electrical and Mechanical Design Inputs
- Standards Compliance and Certification Consultancy
- Energy Efficiency and Sustainability
- Relocation, Consolidation and Modernisation Consultancy
- Specification, Quantity Take-off and Tender Documentation
Typical deliverables
- Feasibility report
- Site evaluation report
- Concept and detailed design
- Calculation reports
- Technical specification
- Quantity take-off and cost estimate
Let us define the scope together
A short discovery call is enough to identify the slice of this portfolio you actually need.
Request a quoteRelated services
What usually runs alongside this
Data Centre Construction and Turnkey Delivery
Turnkey data centre construction from shell and core to commissioning, with all disciplines under one project management.
EXPLORE Critical InfrastructureHVAC and Mechanical Infrastructure Systems
The complete mechanical infrastructure: heat load calculation, equipment selection, commissioning and efficiency optimisation.
EXPLORE Critical InfrastructureExtra-Low Voltage Systems and Electrical Engineering
From structured cabling to CCTV and access control, from fire detection to building automation and electrical engineering.
EXPLOREGet started
Let us talk about your project.
The first meeting is a discovery session, not a sales pitch. You are also welcome to evaluate our capability directly through a short pilot or proof of concept (PoC) in your own environment.